| Features | - SBN Pendant Pushbutton Stations are ideally suited for any industrial application. The SBN Series by Magnetek/Electromotive are rugged but lightweight and ergonomically designed to fit comfortably in your hand.
- Mfg. Part No: SBN-4-WBS
- Dimensions: 7.81" (H) x 3.03" (W) x 2.01" (D) / 198.5mm (H) x 77mm (W) x 51mm (D)
- Approximate Weight: 1.0 lbs. / 0.45 kg. (pendant only)
- Electrical Rating: 3A, 250VAC, 50/60 Hz
- Agency Approvals: UL508 and CSA C22.2 No. 14
- NEMA 4/4x rated
- Environmental Rating: Min. of 23°F (-5°C) -no freezing; Max. of 104°F (40°C)
- Enclosure Durability: Material - Polycarbonate, Color - Yellow (Munsell 2.5Y8/12), UV rated outdoor application
- Available in 2 to 12-button custom configurations; with a variety of options and accessories.
- External strain relief hardware relieves tension on individual conductors
- On 6 to 12-button models, a shrouded knock-out hole is provided for the installation of a pilot light or horn accessory
- Elastic, chemically resistant gaskets ensure a tight seal between enclosure front and back
- Pre-wired common circuit simplifies wiring of switches
- Designed with visible contacts to ease wiring
- Tapered round cable entry gland provides a watertight seal, while a slide-on rubber boot provides added water protection
- Internal cable grip allows pendant to be serviced while hanging on cable
- Cable for Pre-Wired Pendants: Available in 8, 12, 16, 24, 30 and 36 conductors, resistant to UV, ozone, water, oil and weather, 105°C (221°F) 600 VAC
|