Magnetek 6-Button SBN Pendant Station, Momentary On/Off, (4) Two-Speed, Part No. SBN-6-WBS

Manufacturer: Magnetek
Availability: In stock
SKU: SBN-6-WBS
Manufacturer part number: SBN-6-WBS
Lead Time (subject to change, call to verify): typically ships in 7-10 business days
*
*
$315.00
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Products Specifications
Attribute nameAttribute value
Features
  • SBN Pendant Pushbutton Stations are ideally suited for any industrial application. The SBN Series by Magnetek/Electromotive are rugged but lightweight and ergonomically designed to fit comfortably in your hand.
  • Mfg. Part No: SBN-6-WBS
  • Dimensions: 11.24" (H) x 3.03" (W) x 2.01" (D) / 285.5mm (H) x 77mm (W) x 51mm (D)
  • Approximate Weight: 1.4 lbs. / 0.63 kg. (pendant only)
  • Electrical Rating: 3A, 250VAC, 50/60 Hz
  • Agency Approvals: UL508 and CSA C22.2 No. 14
  • NEMA 4/4x rated
  • Environmental Rating: Min. of 23°F (-5°C) -no freezing; Max. of 104°F (40°C)
  • Enclosure Durability: Material - Polycarbonate, Color - Yellow (Munsell 2.5Y8/12), UV rated outdoor application
  • Available in 2 to 12-button custom configurations; with a variety of options and accessories.
  • External strain relief hardware relieves tension on individual conductors
  • On 6 to 12-button models, a shrouded knock-out hole is provided for the installation of a pilot light or horn accessory
  • Elastic, chemically resistant gaskets ensure a tight seal between enclosure front and back
  • Pre-wired common circuit simplifies wiring of switches
  • Designed with visible contacts to ease wiring
  • Tapered round cable entry gland provides a watertight seal, while a slide-on rubber boot provides added water protection
  • Internal cable grip allows pendant to be serviced while hanging on cable
  • Cable for Pre-Wired Pendants: Available in 8, 12, 16, 24, 30 and 36 conductors, resistant to UV, ozone, water, oil and weather, 105°C (221°F) 600 VAC
Product Tags